Download
ISO/IEC 27001 Risk Register Template
An Excel risk register for ISO/IEC 27001:2022, built on the same seven steps as our risk assessment guide. Includes editable criteria and a 5×5 matrix (switchable to 3×3), automatic risk and residual-risk levels, a treatment plan and a 93-control Statement of Applicability.
Available now
What is inside
What you get
Editable criteria with a 5×5 matrix, switchable to 3×3
Automatic risk and residual-risk levels
Risk treatment plan
93-control Statement of Applicability
Formats: Excel risk register. Content current as of October 2026.
Standard
About ISO/IEC 27001
Requirements, certification route and how AEC supports implementation.
ISO/IEC 27001 → DownloadsAll downloads
Checklists, templates and tools available now or in preparation.
All downloads → SupportTalk to a specialist
Gap assessment, implementation and certification support for ISO/IEC 27001.
Get a quote →